|
Professional Design Experience
Dr. Edgell is a registered Architect who has designed a variety of buildings (over 1.4 million square feet of space) and has knowledge of current design trends, theories, and collaborative processes. JGPG needed to decide between three design scenarios for the Pier 70 project in San Francisco. Dr. Edgell was asked to develop a decision framework. He created a comprehensive fourteen-point guideline for aesthetic, structural, and functional considerations. By using the guideline, the JGPG team was able to quickly reach consensus and select an option.
Design Projects
PROJECTS WHILE WITH ADD INC
|
|
Legent Software Corporation Headquarters—Base building and primary interior spaces; project designer/manger; 240,000 sf; Pittsburgh, PA
| |
|
Prudential Real Estate/XZY Corp at Andover Tech Center—Masterplanning and building concept sketches; designer; 350,000 sf; Andover, MA
| |
|
Prudential Real Estate/Lotus at Andover Tech Center—Masterplanningnd building concept sketches; designer; 310,000 sf;
Andover, MA
| |
|
Massachusetts Department of Public Works (MDPW) District #7 Administration Building—Base building and interior fit-up; project designer/manager; 28,000 sf; Wareham, MA
| |
|
Bank of New England Dedham Branch—Base building; project designer/manager and construction administrator; 12,000 sf; Dedham, MA
| |
|
Shopping Center Renovation—Concept sketches; designer; Hyannis, MA
| |
|
New England Development Corporation Headquarters—Concept sketches; designer; 125,000 sf; Wayland, MA
| |
|
Lincoln National Life at 100 River Ridge Drive—Interior fit-up; project designer/manager and construction administrator; 2,000 sf; Norwood, MA
| |
|
BMG Records at 100 River Ridge Drive—Interior fit-up; project designer/manager and construction administration; 5,000 sf; Norwood, MA
| |
|
Nissan Acceptance Corporation at 100 River Ridge Drive—Interior fit-up; project designer/manager and construction administrator; 7,000 sf; Norwood, MA
| |
|
100 River Ridge Drive at River Ridge Office Park—Base building; project designer/manager and construction administrator; 104,000 sf; Norwood, MA
| |
|
Berol Building At Still River Office Park—Base building renovation; project designer; 208,000 sf; Danbury, CT
| |
|
Park Nine Central—Base building; project manager and construction administrator; 50,000 sf; Southborough, MA
| |
|
Simon & Schuster—Interior fit-up; project designer and construction administrator; 90,000 sf; Needham, MA
|
PROJECTS WHILE WITH URS DALTON
|
|
Hahn, Loeser & Parks Law Firm—Interior fit-up; project designer/manager; 5,000 sf; Cleveland, OH
| |
|
Old Ben Coal (Standard Oil Company)—Interior fit-up; designer;
40,000 sf; Cleveland, OH
| |
|
Cleveland Convention Center Ballroom and Lobby—Interior renovations; designer; Cleveland, OH
| |
|
National City Bank Trust Department—Interior design; designer;
2,000 sf; Cleveland, OH
| |
|
URS Corporation World Headquarters Boardroom—Interior and furniture design; designer; San Mateo, CA
|
PROJECTS WHILE WITH WILLIAM DORSKY ASSOCIATES
|
|
Cardinal Federal Savings Bank—Tower (21 stories) concept sketches; designer; 350,000 sf; Cleveland, OH
| |
|
One City Center (Golden Triangle Competition)—Tower (13 stories) base building and primary interior spaces; designer; 300,000 sf; Portland, ME
| |
|
Suntree Shopping Center and Office Park—Masterplanning concept sketches; designer; 175,000 sf; Melbourne, FL
| |
|
South Broward Senior Citizens Center—Base building and interior design concept plan; designer; 20,000 sf; South Broward, FL
|
|